Albania – North Macedonia Power Interconnection: Feasibility Study for Elbasan - Fier Overhead Transmission Line

Albania – North Macedonia Power Interconnection: Feasibility Study for Elbasan - Fier Overhead Transmission Line

Project Description

WBIF has provided a technical assistance grant for the preparation of a Feasibility Study for the construction of a new high-voltage overhead line between Elbasan and Fier at 400 kV with substation upgrades adjacent to the existing Fier and Elbasan substations. Additional to the Feasibility Study, technical assistance included a Cost-Benefit Analysis and an Environmental Impact Assessment (EIA).

The investment concerns the construction of a 400-kV single circuit line, 74 km long, between Elbasan and Fier, an upgrade of a spare bay in substation Elbasan 2, and the extension and upgrade of substation Fier to 400 kV. 

The new high-voltage supply system will enhance the capacity and reliability of the power supply system in the region, as well as reduce the current transmission losses. A minimum of 800,000 people and numerous industries in the Fier and Berat/Kucova regions and Elbasan Prefecture will benefit from an uninterrupted electricity supply. The new transmission lines will also facilitate the future regional network interconnection with Italy and North Macedonia.

Partner Financial Organisations

Western Balkans Partners