Bosnia and Herzegovina's power sector is currently dominated by the use of fossil fuels. This project assesses the feasibility of developing a wind farm in several locations on Vlasic mountain, with the intent to develop sustainable alternatives to the current energy mix. The costs of the study have been covered by the WBIF through a €875,000 grant. The study was completed in December 2015.
WBIF | Grant | WB7-BIH-ENE-09 | € 840,000 |
EIB | Loan | € 36,000,000 | |
Beneficiary Contribution | Own Contribution | € 2,500,000 | |
KfW | External Loan | € 36,000,000 | |
Total | € 75,340,000 | ||
Total Grants | € 840,000 | ||
Total Loans | € 36,000,000 |