Showing 351 to 375 of 560 grants

Beneficiary Investment Sector Status Completion (est)
Serbia Development and Implementation of Integral Torrential Floods and Erosion Protection Measures, Works and Structures Based on a Green Solution in Krupanj Pilot Area, Likodra River Basin Environment Active 30 Sep 2026
Kosovo* Kosovo, Advancing Digital Connectivity for Economic Development in the Municipality of Prizren: Pre-feasibility Study DigitalInfrastructure Cancelled 29 May 2021
Bosnia and Herzegovina Bosnia and Herzegovina, Housing and Social Integration of Vulnerable Persons Living in Collective Accommodation: Technical Assistance for Project Implementation, Management and Coordination Social Completed 31 Dec 2024
Bosnia and Herzegovina Bosnia and Herzegovina, Sarajevo Water Project: Technical Assistance for Supervision of Works Financed by Tranche 2 Loan Environment Completed 06 Jun 2025
Albania Albania, Regional HPC Infrastructure, Interconnection of Regional University Campuses via WB NREN to the Infrastructure and Upgraded HPC-hosting Data Centre: Pre-feasibility Study, Needs Assessment DigitalInfrastructure Completed 28 Feb 2023
Albania Albania, Smart Cities – Smart Villages: Conceptual Design, Feasibility Study and ESIA for Three Pilot Cities DigitalInfrastructure Active 30 Oct 2026
Albania Albania, Development of a Broadband Atlas for Albania: Pre-feasibility Study DigitalInfrastructure Completed 16 Nov 2022
Serbia Serbia, Next Generation Broadband Connectivity for Rural Schools in White Zones: Fixed Broadband Mapping, Feasibility Study and Cost-Benefit Analysis, Conceptual Designs, ESIA, Preliminary Designs DigitalInfrastructure Completed 30 Apr 2022
Albania Balkans Digital Highway: Feasibility Study and Cost Benefit Analysis, Preliminary Design DigitalInfrastructure Completed 30 Dec 2023
Kosovo* Kosovo, Connecting Primary and Secondary Schools in Kosovo: Feasibility Study and Cost-Benefit Analysis DigitalInfrastructure Completed 17 Jan 2023
Albania Albania, Pilot Project for Rural Broadband Development in Shkodra, Tropoja, Kukës and Dibra: Detailed Design, ESIA, Tender Documents DigitalInfrastructure Cancelled 02 Feb 2022
Serbia Orient/East-Med Corridor, Belgrade Marshalling Yard – Ostruznica – Batajnica Railway Line: Feasibility Study, ESIA, Preliminary Design, Tender Documents Transport Active 31 Mar 2027
Serbia Serbia, Flood Risk Management Programme for Central Serbia: Flood Risk Management Plan, Strategic Environmental Assessment Environment Completed 30 May 2024
Serbia Serbia, Construction of the Struganik Dam: Feasibility Study, ESIA, Preliminary Design Environment Active 14 Oct 2026
Serbia Serbia, Energy Efficiency Renovation Programme of Central Government Buildings: PIU Support Energy Completed 27 Sep 2023
Serbia Serbia, North CSE Corridor, New 400/110 kV 2x300 MVA Belgrade West Substation and OHL 400 kV Serbia – Romania: Pre-feasibility Study, ESIA Energy Completed 27 Aug 2021
Albania REEP Plus, Window 4 - Public Buildings: Nearly Zero-Energy Buildings Energy Active 31 Dec 2028
Montenegro Orient/East-Med Corridor, Route 4, Golubovci – Bar Section of the Bar – Vrbnica Railway Line: ESIA, Preliminary Design, Detailed Design, PIU Support, Other Transport Active 31 Oct 2026
Montenegro Montenegro, Broadband Infrastructure Development: National Broadband Development Plan, PIU Support DigitalInfrastructure Completed 09 Dec 2021
North Macedonia North Macedonia, Strengthening the Transmission Network in the Southeast Region of North Macedonia: Feasibility Study, ESIA, Preliminary Design, Tender Dossier Energy Completed 04 Jun 2025
North Macedonia North Macedonia, North Macedonia – Kosovo Gas Interconnection: Feasibility Study, ESIA Scoping Energy Completed 30 Aug 2023
North Macedonia North Macedonia Digital Economy Project: Feasibility Study, ESIA, Preliminary Design DigitalInfrastructure Cancelled 28 Mar 2020
Kosovo* Kosovo, Construction and Rehabilitation of Healthcare Infrastructure: Feasibility Study, Conceptual Design, Other Social Active 31 Aug 2026
Kosovo* Kosovo, Sewage and Rainwater Network for Pristina Agglomeration: Feasibility Study/Masterplan Environment Completed 30 Jun 2022
Kosovo* Kosovo, Construction of Desivojce Dam: Detailed Design, Tender Dossier Environment Active 30 Sep 2027